hospitality / entertainment
mercedes benz superdome
nfl stadium enhancement | new orleans, la
WDG designed mechanical, electrical, plumbing systems and fire protection improvements for the 2009-2011 Superdome Enhancement Project. Work included renovation and expansion of the plaza concourse with additional concessions and toilet facilities, addition of two event floor level clubs, relocation of the press box to the upper level, and new suites where the press box was located. WDG utilized the Revit model of the Superdome to generate drawings for the project. Mechanical and electrical work included food service additions and modifications, HVAC modifications, addition/renovation of eighteen public restrooms (total fixture count approximately 350) to include high efficiency/low water consumption water closets, urinals, and lavatories, lighting upgrades, LED exterior lighting system design, and substation replacement. Code related improvements included modifications to facilities for ADA compliance, fire alarm system work, and sprinkler system work.