jefferson PARISH SCHOOL BOARD
gretna middle school Hurricane IDA REPAIR
Gretna, LouisianaWDG | Architects Engineers provided architectural design services for the renovation of Gretna Middle School (Currently Thomas Jefferson Academy for Advanced Studies) for damages incurred from Hurricane Ida in August of 2021. The renovation scope included both interior and exterior improvements for four buildings on the school campus. Exterior improvements included the demolition and replacement of the existing built-up coal tar roof with a new SBS mod bit roof system. The existing brick parapet was raised to accommodate the increased insulation requirements to meet current building codes. Custom fabricated scuppers for overflow drainage, new steel roof ladders, new coping, new roof drain covers, and selective repointing of the existing brick walls were also included in the exterior improvements. Interior renovations included replacement of existing damaged VCT flooring and rubber base, acoustical ceiling tiles, and metal lockers.
YOUNG AUDIENCE CHARTER school Hurricane IDA REPAIR
Gretna, LouisianaWDG | Architects Engineers provided architectural design services for the renovation of Young Audience Elementary School for damages incurred from Hurricane IDA in August of 2021. The renovation scope included both interior and exterior improvements for four of the seven buildings on the school campus. Exterior improvements included the demolition and replacement of the existing roof system with a new SBS mod bit roof system for Buildings 2, 3, and the Main. The existing Gymnasium standing seam metal roof was replaced with new. Existing gutters and downspouts were to be reused where possible. Interior renovations included replacement of existing damaged VCT flooring, rubber base, and select acoustical ceiling tiles.
MCDONOGH 26 ELEMENTARY school Hurricane IDA REPAIR
Gretna, LouisianaWDG | Architects Engineers provided architectural design services for the renovation of McDonogh 26 Elementary School for damages incurred from Hurricane IDA in August of 2021. The renovation scope included both interior and exterior improvements for all five buildings on the school campus. Exterior renovations included demolition and replacement of existing roof cap flashing. The existing gym’s metal roof was replaced with new. Re-glazing of select existing windows and siding/soffit replacement were also included in the scope of work. Interior renovations included selecting removal/replacement of damaged VCT, rubber base, gypsum, and acoustical tile ceilings.cuillier career center Hurricane IDA REPAIR
Marrero, LouisianaWDG | Architects Engineers is currently providing architectural design services for the renovation of Joseph A. Cuillier Career Center for damages incurred from Hurricane IDA in August of 2021. The renovation scope includes both interior and exterior improvements for eight buildings on the school campus. Renovation scope includes roof repairs/replacement and replacement of damaged interior finishes. Construction documents are estimated to be completed by early Spring 2026 with construction taking place in the Summer/Fall of 2026.